Manage Breakpoints
Specifies the options for breakpoints.
Točke prekida
Enter the line number for a new breakpoint, then click New.
Aktivan
Activates or deactivates the current breakpoint.
Broj prolaza
Specify the number of loops to perform before the breakpoint takes effect.
Novo
Creates a breakpoint on the line number specified.
Obriši
Deletes the selected breakpoint.